Ï Training building of Mary Oil and Gas Secondary Professional School is opened
mail-icon
altynasyr.newspaper@sanly.tm
EN RU TK

Training building of Mary Oil and Gas Secondary Professional School is opened

view-icon 4449
Opening ceremony of new training building of Mary Oil and Gas Secondary Professional School of Türkmengaz State Concern was held in administrative centre of Mary Velayat. The facility was built at the work order of the Concern with participation of investments from the Republic of Korea, namely from the Agency for International Cooperation of this country, by construction personnel of Çyzgy Business Entity.

Representatives of ministries and profile departments, honoured elders and students took part in the opening ceremony.

Total size of new building is more than 2,927 square meters. It has 16premises for practical sessions, which are equipped with training equipment for education of qualified specialists.

Training in four directions – mechanics (heavy engineering technology), industrial equipment (construction of industrial equipment and its technical application), electrics (automation of power energy systems and relay protection) as well as information and computer science (information systems) will be given to the students in this building. In general, the building is designated for 240 students.

Entire structure of education facility includes administration building, three training buildings and student hostel for 250 students. At present, 1,900 future specialists of national fuel and energy complex study in Mary professional school.

Just in profile specializations and digital technologies, the education facilities admits 700 student every year who receive education in 18 disciplines.