The asphalt plant of the road construction products division of the Dashoguz Velayat Road Operation Department, located in the Boldumsaz etrap, is prepared for the next work season.
During the comprehensive preventive maintenance of the equipment, the working condition of electric motors, gearboxes, vibrators, and all elements exposed to friction were checked; conveyor belts were replaced as necessary, unit bearings were lubricated, and other work was carried out.
The company's team understands that the progress and quality of road construction work carried out in the region annually largely depend on resource availability. The plant's main equipment - two modern asphalt mixing facilities designed to produce 160 tons and 120 tons of asphalt per hour - allows for a large volume of manufactured products and is important for the consistent development of the road infrastructure in the velayat.
At the same time, the division's workforce is also busy producing inert material. Since the beginning of the year, about forty thousand cubic meters of crushed stone have already been produced, which is necessary for the construction and reconstruction of highways.
The Dashoguz velayat has a developed network of road communications for various purposes. Here, taking into account the growth of motorization, the progressive development of the road structure is consistently carried out, designed to fully satisfy the needs of the economy and the population for transport services.