Ï The Ministry of Health of Turkmenistan is allowed to enter into a contract with the «Nahal» EO for the construction of a new complex of buildings for the «Arçman» medical centre
mail-icon
altynasyr.newspaper@sanly.tm
EN RU TK

The Ministry of Health of Turkmenistan is allowed to enter into a contract with the «Nahal» EO for the construction of a new complex of buildings for the «Arçman» medical centre

view-icon 4126

In order to implement comprehensive measures for the effective use of the capabilities of various types of mineral waters and sanatorium treatment on the basis of scientific study in the era of the Revival of the new epoch of the powerful state, the President of Turkmenistan signed a Resolution, allowing the Ministry of Health and Medical Industry to conclude a design and construction contract with the «Nahal» EO equipping with modern equipment and landscaping the surrounding areas an additional new complex of buildings of a medical centre for 400 beds and reconstruction of the former buildings «A» and «B» in the «Arçman» sanatorium in the Baherden etrap of the Ahal velayat.

According to the document, the terms of the contract provide for the reconstruction or construction of new external supply engineering systems and structures for the complex of buildings for electricity, gas, water supply, communications and sewerage with connection to the citywide network.

The document also stipulates that construction work should begin in November 2023 and the facility will be fully ready for operation in October 2026.